« Back to Building and Construction Services Home « Projects
Project Archive
Marine Construction Services

Project Name:
Crystal River Boardwalk and Overlook
Description:
Installation of marsh walkover in Crystal River State Park. Due to environmentally sensitive nature of the saw grass marsh and 10’ trail to the project site no heavy equipment was able to be used on this project. Installation of 18’ pilling and timbe

Project Name:
Slipway Repairs to Berths 1-5
Description:
Slipway Berth Repairs for Berths one through five. The work includes partial depth concrete spall repairs and various improvements to the USMC facility with Berths 1-5 and incidental related work.

Project Name:
Slipway Repairs to Berths 1-5
Description:
Slipway Berth Repairs for Berths one through five. The work includes partial depth concrete spall repairs and various improvements to the USMC facility with Berths 1-5 and incidental related work.

Project Name:
Whitewater Bay Docks
Description:
Demolish and rebuild Whitewater Bay after Hurricane Wilma. Demolition of existing structures and reconstruction of Whitewater Bay to include, Floating docks, fixed piers and repairs to aluminum docks in Florida Bay

Project Name:
Marine Construction Services
Description:
OTAK Group, Inc provides marine transportation for hauling and transport utilizing a LCM8 Landing Craft

Project Name:
Timucuan Ecological Preserve
Description:
Design and construction of a public boat launch and pier at the Timucuan Preserve National Park Cedar Point location. Security, Environmental design and permitting, public safety and wild tidal fluctuations were of utmost concern.

Project Name:
Dry Tortugas Remove and Replace Finger Piers
Description:
Repairs to damage caused by Hurricane Ike at Ft Jefferson national monument located 70 miles off of Key West in the Dry Tortugas. Installation of new piling, framework, fiberglass decking, stairways, tie-in to existing structures and special logistic

Project Name:
Historic Tom Harbor Cut Fishing Platforms
Description:
Construction of 20’ by 30’ cast in place cantilevered fishing platforms evenly spaced along the length of an existing historic pedestrian bridge structure. OTAK Group value-engineered the proposed concept

Project Name:
St. John's River Bulkhead
Description:
Repair and replace concrete sheet pile bulkhead at eight locations along the St Johns River in the Riverside residential area. Work included replacement of concrete pile cap and tree removal as well as drainage structure replacement

Project Name:
Ft. Clinch Pier
Description:
Timber handrail removal and replacement, water and electric utility relocation, installation of custom scaffolding systems for an overhead shotcrete repair operation, timber boardwalk & decking r/r on a 2400lf pier.









